CN
HYDROGEN TESTING SOLUTIONS
Laboratory design and turnkey engineering

Based on the full spectrum of test equipment, from single battery, short pile, large pile, system, BOP and hydrogen production test equipment, to provide customers with the overall laboratory design and turnkey engineering, in strict accordance with national standards, to provide customers with the full life cycle of laboratory construction technical support services, the scope of supply is roughly as follows:

1.jpg

1. GB 50235-2010 "National Industrial Pipeline Installation and Acceptance Code"

2. SH3501-2011 "Petrochemical Toxic and Combustible Media Pipeline Engineering Construction and acceptance Code"

3. GB50231-2009 "General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering"

4. GB 50236-2010 "Field equipment, Industrial pipeline welding engineering construction and acceptance Code"

5. GB50093-2013 "Automation Instrumentation Engineering Construction and Quality Acceptance Code"

6. GB50300-2013 "Unified Standard for Quality Acceptance of Construction Projects"

7. GB50016-2014 "Code for Fire Protection in Building Design"

8. GB50016-2010 "Unified Standard for Quality Inspection and Evaluation of Industrial Installation Engineering"

9. GB50016-2011 "Industrial Metal Pipeline Engineering construction quality acceptance Code"

10. GB50303-2002 "Building Electrical Engineering Construction Quality Acceptance Code"

11. GBJ 131-90 "Automatic Instrument installation engineering Quality inspection and evaluation Standard"

12. GB 4962-2008 "Safety Technical Regulations for Hydrogen Use"

13. GB 50177-2005 "Hydrogen Station Design Code"